Scanclimber Oy is successfully serving in the construction of cooling towers for Belarus’ first nuclear power plant at Ostrovets, Grodno region. The project includes two 170 m cooling towers. Once completed, it will hold the record for construction hoists at such height ever installed in Belarus.

A nuclear power plant was planned for Belarus since the 1980’s but a series of events like Chernobyl nuclear disaster, etc. put the development plan on hold till late 2007. Finally in mid-2008, the plan for the nuclear power plant was officially approved and started. After a thorough feasibility study, the first concrete was poured on 6th November, 2013. Construction for the second unit started eight months later with construction of each unit expected to take about five years. The approved plan for the nuclear power plant included two units with total capacity of up to 2 400 MW of electricity.

The planned structure of the nuclear power plant consisted of two units and each unit would be equipped with a Scanclimber hoist. The hoists will be able to reach the towers’ maximum height of 170 metres. The project faced certain challenges concerning the installation of the hoists on the site.
The combination of these obstacles made the project quite challenging. Considering all such factors, the Scanclimber SC2032F-65 was chosen from the available fleet for assisting the construction.

There are certain unique features in this mega project.
| Project Facts | |||
|---|---|---|---|
| Hoist used | SC2032F | ||
| No. of units used | 1 | ||
| Payload of hoist | 2000 kg or 24 persons | ||
| Height of towers | 170 m | ||
| Project beginning | November, 2013 | ||
| Project completion (expected) | Late 2020 | ||
| Main use / benefits of hoist | Efficient transportation of passengers and materials | ||